Filters
Question type

Study Flashcards

What is the systems development life cycle?


A) Involves establishing a high-level plan of the intended project and determining project goals
B) Involves analyzing end-user business requirements and refining project goals into defined functions and operations of the intended system
C) Involves describing the desired features and operations of the system
D) The overall process for developing information systems from planning and analysis through implementation and maintenance

E) A) and B)
F) A) and D)

Correct Answer

verifed

verified

What are project deliverables?


A) A temporary endeavor undertaken to create a unique product or service
B) The application of knowledge, skills, tools, and techniques to project activities in order to meet or exceed stakeholder needs and expectations from a project
C) Any measurable, tangible, verifiable outcome, result, or item that is produced to complete a project or part of a project
D) Represent key dates when a certain group of activities must be performed

E) B) and D)
F) B) and C)

Correct Answer

verifed

verified

Human resources is the most common outsourced function.

A) True
B) False

Correct Answer

verifed

verified

What is a graphical network model that depicts a project's tasks and the relationships between those tasks?


A) Gantt chart
B) PERT chart
C) Dependency
D) All of the above

E) A) and B)
F) All of the above

Correct Answer

verifed

verified

Extensible Markup Language is an open-standards way of supporting interoperability.

A) True
B) False

Correct Answer

verifed

verified

Test conditions detail the steps the system must perform along with the expected result of each step in the implementation phase the organization places the system into production so users can begin to perform actual business operations with it.

A) True
B) False

Correct Answer

verifed

verified

Which reports present data that is distributed inside the organization and is intended for employees within an organization?


A) Internal reports
B) Detailed internal reports
C) Summary internal reports
D) Exception reports

E) B) and C)
F) All of the above

Correct Answer

verifed

verified

Corrective maintenance makes system changes to reduce the chance of future system failure.

A) True
B) False

Correct Answer

verifed

verified

Software engineering is a disciplined approach for constructing information systems through the use of common methods, techniques, or tools.

A) True
B) False

Correct Answer

verifed

verified

Which implementation is a small group of people using the new system until it is verified that it works correctly then the remaining users migrate?


A) Parallel implementation
B) Plunge implementation
C) Pilot implementation
D) Phased implementation

E) A) and D)
F) A) and C)

Correct Answer

verifed

verified

What is the capability of services to be joined together on demand to create composite services, or disassembled just as easily into their functional component?


A) Service-oriented architecture
B) Service
C) Loose coupling
D) Interoperability

E) All of the above
F) None of the above

Correct Answer

verifed

verified

What language groups data and corresponding processes into objects?


A) Scripting language
B) Object-oriented language
C) Fourth-generation language
D) All of the above

E) None of the above
F) B) and C)

Correct Answer

verifed

verified

Fifth generation programming languages for artificial intelligence and neural networks.

A) True
B) False

Correct Answer

verifed

verified

Detailed internal reports present information with little or no filtering or restrictions of the data.

A) True
B) False

Correct Answer

verifed

verified

Control objects for information and related technology (COBIT) is a set of best practices that helps an organization to maximize the benefits of an information system, while at the same time establishing appropriate controls to ensure minimum errors.

A) True
B) False

Correct Answer

verifed

verified

A prototype is a smaller-scale representation or working model of the users' requirements or a proposed design for an information system.

A) True
B) False

Correct Answer

verifed

verified

Which gate questions answered in this phase address ownership of the system and training of key personnel?


A) Gate one
B) Gate two
C) Gate three
D) Gate four

E) B) and D)
F) A) and C)

Correct Answer

verifed

verified

What is created that highlights how to use the system and how to troubleshoot issues or problems?


A) Detailed user documentation
B) Requirements definition document
C) Scope document
D) All of the above

E) A) and D)
F) C) and D)

Correct Answer

verifed

verified

A dependency is a logical relationship that exists between the project tasks, or between a project task and a milestone.

A) True
B) False

Correct Answer

verifed

verified

The oldest and the best known is the waterfall methodology, a sequence of phases in which the output of each phase becomes the input for the next.

A) True
B) False

Correct Answer

verifed

verified

Showing 21 - 40 of 321

Related Exams

Show Answer