Maintenance activities are often organized into the two groups:


A) breakdown maintenance and preventive maintenance.
B) breakdown maintenance and predictive maintenance.
C) preventive maintenance and predictive maintenance.
D) equipment maintenance and breakdown maintenance.
E) equipment maintenance and buildings maintenance.

F) A) and E)
G) A) and D)

Correct Answer

verifed

verified

Which of the following is most closely associated with breakdown maintenance?


A) Equipment adjustments
B) Equipment cleaning
C) Equipment inspection
D) Repair of broken parts
E) Replacement of worn parts

F) A) and D)
G) A) and C)

Correct Answer

verifed

verified

In the broadest sense,preventive maintenance extends back to the installation stage of equipment and facilities.

A) True
B) False

Correct Answer

verifed

verified

Ideally,preventive maintenance will be performed:


A) after a planned inspection.
B) after the passage of a specified period of time.
C) after a predetermined number of operating hours.
D) just prior to the start of the workday.
E) just prior to a breakdown.

F) B) and E)
G) B) and C)

Correct Answer

verifed

verified

The frequency of breakdown of a piece of equipment per month is shown in the table.The cost of a breakdown is $1,000 and the cost of preventive maintenance is $2,000 per month.Assume that the equipment breakdown can be avoided if preventive maintenance is performed.Should the manager use preventive maintenance,or would it be better to fix the equipment when it breaks down?

Correct Answer

verifed

verified

The expected number of breakdowns withou...

View Answer

In the area of maintenance,there is a trade-off between the cost of preventive maintenance and breakdown (emergency)maintenance.

A) True
B) False

Correct Answer

verifed

verified

The optimum amount of preventive maintenance is where:


A) total breakdown costs are a minimum.
B) total preventive maintenance costs are a minimum.
C) each maintenance component cost is a minimum.
D) total maintenance costs are a maximum.
E) total maintenance costs are a minimum.

F) A) and B)
G) C) and D)

Correct Answer

verifed

verified

Reliability-centered maintenance is an approach based on;


A) dealing with breakdowns after they occur.
B) reducing the effect of each major cause of failure.
C) increasing frequency of preventive maintenance.
D) predictions based on historical data.
E) routine planned inspections.

F) All of the above
G) A) and B)

Correct Answer

verifed

verified

The average time before breakdown of a machine is normally distributed and has a mean of 7 weeks and a standard deviation of 1.5 weeks.If breakdown cost averages $2,500 and preventive maintenance costs $500,what is the optimal preventive maintenance interval?

Correct Answer

verifed

verified

The ratio of preventive cost to the sum ...

View Answer

The average time before breakdown of a machine is normally distributed and has a mean of 7 weeks and a standard deviation of 1.5 weeks.If breakdown cost averages $2,500 and preventive maintenance costs $500,what is the optimal preventive maintenance interval?

Correct Answer

verifed

verified

The ratio of preventive cost to the sum ...

View Answer

The frequency of breakdown of a piece of equipment per month is shown in the table.The cost of a breakdown is $1,000 and the cost of preventive maintenance is $2,000 per month.Assume that the equipment breakdown can be avoided if preventive maintenance is performed.Should the manager use preventive maintenance,or would it be better to fix the equipment when it breaks down? The frequency of breakdown of a piece of equipment per month is shown in the table.The cost of a breakdown is $1,000 and the cost of preventive maintenance is $2,000 per month.Assume that the equipment breakdown can be avoided if preventive maintenance is performed.Should the manager use preventive maintenance,or would it be better to fix the equipment when it breaks down?

Correct Answer

verifed

verified

The expected number of breakdowns withou...

View Answer

Factors affecting the decision of how much preventive maintenance is desirable typically include all of the following EXCEPT:


A) age of equipment.
B) type of product.
C) degree of technology.
D) type of production process.
E) condition of facilities and equipment.

F) A) and D)
G) A) and B)

Correct Answer

verifed

verified

Showing 21 - 32 of 32