Bugs are defects in the code of an information system.

A) True
B) False

Correct Answer

verifed

verified

What is the project scope?


A) An individual who is an expert in project planning and management,defines and develops the project plan,and tracks the plan to ensure that the project is completed on time and on budget
B) Describes the business need (the problem the project will solve) and the justification,requirements,and current boundaries for the project
C) A formal,approved document that manages and controls the entire project
D) Involves graphically representing the processes that capture,manipulate,store,and distribute information between a system and its environment

E) A) and C)
F) B) and C)

Correct Answer

verifed

verified

The project requirements document defines the specifications for product/output of the project and is key for managing expectations,controlling scope,and completing other planning efforts.

A) True
B) False

Correct Answer

verifed

verified

What is the capability of two or more computer systems to share data and resources,even though they are made by different manufacturers?


A) Service-oriented architecture
B) Service
C) Loose coupling
D) Interoperability

E) B) and C)
F) A) and C)

Correct Answer

verifed

verified

The implementation phase involves taking all of the detailed design documents from the design phase and transforming them into the actual system.

A) True
B) False

Correct Answer

verifed

verified

Third generation high-level programming languages are languages such as C+ and Java.

A) True
B) False

Correct Answer

verifed

verified

Which gate in the RUP methodology includes building and developing the project?


A) Inception
B) Elaboration
C) Construction
D) Transition

E) B) and C)
F) All of the above

Correct Answer

verifed

verified

What emphasizes extensive user involvement in the rapid and evolutionary construction of working prototypes of a system to accelerate the systems development process?


A) RAD methodology
B) Agile methodology
C) Waterfall methodology
D) Extreme programming
This is the definition of RAD.

E) A) and B)
F) All of the above

Correct Answer

verifed

verified

In-sourcing has been instrumental in creating a viable supply of IT professionals and in creating a better quality workforce combining both technical and business skills.

A) True
B) False

Correct Answer

verifed

verified

Explain the three different types of outsourcing along with their benefits and challenges.

Correct Answer

verifed

verified

Onshore outsourcing-engaging another com...

View Answer

SOA ensures that MIS systems can adapt quickly,easily,and economically to support rapidly changing business needs.

A) True
B) False

Correct Answer

verifed

verified

What is an activity-based process in which each phase in the SDLC is performed sequentially from planning through implementation and maintenance?


A) RAD methodology
B) Agile methodology
C) Waterfall methodology
D) Extreme programming

E) All of the above
F) A) and B)

Correct Answer

verifed

verified

What is a disciplined approach for constructing information systems through the use of common methods,techniques,or tools?


A) Software
B) Software testing
C) Software engineering
D) All of these choices

E) A) and D)
F) B) and C)

Correct Answer

verifed

verified

Which of the following is a fundamental of the RAD methodology?


A) Focus initially on creating a prototype that looks and acts like the desired system
B) Actively involve system users in the analysis,design,and development phases
C) Accelerate collecting the business requirements through an interactive and iterative construction approach
D) All of these choices

E) A) and D)
F) B) and C)

Correct Answer

verifed

verified

What measures the cost-effectiveness of a project?


A) Economic feasibility
B) Operational feasibility
C) Schedule feasibility
D) Technical feasibility

E) B) and C)
F) A) and D)

Correct Answer

verifed

verified

Gate three is construction,and this phase includes building and developing the product.

A) True
B) False

Correct Answer

verifed

verified

What is the overall process for developing information systems from planning and analysis through implementation and maintenance?


A) Systems development life cycle
B) Project management
C) Systems management
D) Project development life cycle
This is the definition of the SDLC.

E) B) and D)
F) A) and B)

Correct Answer

verifed

verified

What is the analysis phase in the SDLC?


A) Involves establishing a high-level plan of the intended project and determining project goals
B) Involves analyzing end-user business requirements and refining project goals into defined functions and operations of the intended system
C) Involves describing the desired features and operations of the system
D) Involves placing the system into production so users can begin to perform actual business operations with the system

E) None of the above
F) A) and B)

Correct Answer

verifed

verified

Process modeling illustrates the movement of information between external entities and the processes and data stores within the system.

A) True
B) False

Correct Answer

verifed

verified

Which methodology provides a framework for breaking down the development of software into four gates?


A) SCRUM
B) XP
C) RAD
D) RUP

E) C) and D)
F) B) and D)

Correct Answer

verifed

verified