What is the estimated slack time for activity D?


A) 0 days
B) 19 days
C) 20 days
D) 79 days
E) 80 days

F) All of the above
G) A) and C)

Correct Answer

verifed

verified

If two consecutive activities have shared slack, this means that each of them can use only half of the slack without delaying completion of the project.

A) True
B) False

Correct Answer

verifed

verified

Which of the following is not typically treated as part of a project life cycle?


A) feasibility analysis
B) planning
C) maturity
D) incubation
E) alternative generation

F) A) and D)
G) A) and C)

Correct Answer

verifed

verified

What is the probability that the critical path for this project will be completed within 200 days?


A) 0.8413
B) 0.9544.
C) 0.9772
D) 0.9974
E) 0.9987

F) A) and D)
G) C) and D)

Correct Answer

verifed

verified

In order to determine the probability of timely project completion, it is sometimes necessary to take into account paths other than the critical path.

A) True
B) False

Correct Answer

verifed

verified

The standard deviation of the critical path is equal to the sum of the standard deviations of all of the activities on the critical path.

A) True
B) False

Correct Answer

verifed

verified

What is the estimated expected (mean) time for project completion?


A) 41 days
B) 70 days
C) 100 days
D) 120 days
E) 221 days

F) B) and C)
G) A) and B)

Correct Answer

verifed

verified

The optimum project length in crashing occurs where the cumulative cost of crashing equals savings in the indirect costs.

A) True
B) False

Correct Answer

verifed

verified

Project management differs from management of more traditional activities mainly because of:


A) its limited time frame
B) its unique, defined set of activities
C) (a) and (b)
D) the requirement for use of the appropriate resources
E) the need for planning and execution

F) B) and D)
G) A) and E)

Correct Answer

verifed

verified

Project managers are sometimes able to reduce indirect project costs by increasing direct costs.

A) True
B) False

Correct Answer

verifed

verified

Prepare a crashing plan for the following project that will reduce the project duration by three weeks.

Correct Answer

verifed

verified

blured image First crashed activity is 5-6 for a cos...

View Answer

Many activities have slack time; if we add these slack times together, this represents the potential improvement in early completion for the project.

A) True
B) False

Correct Answer

verifed

verified

The sum of times of the longest path in a network indicates expected project completion time, and the activities represent the critical activities.

A) True
B) False

Correct Answer

verifed

verified

A hierarchical (vertical) listing of what must be done during a project is called matrix.

A) True
B) False

Correct Answer

verifed

verified

Consider the project depicted by the following A-O-A diagram:

Correct Answer

verifed

verified

blured image What is the probabi...

View Answer

If the expected length of a path is more than 2.5 standard deviations less than a desired project completion time, the path would not be a factor in assessing the probability of finishing the project on time.

A) True
B) False

Correct Answer

verifed

verified

Which of the following is not an element of the project management triangle?


A) cost
B) schedule
C) resources
D) quality
E) performance objectives

F) A) and D)
G) A) and C)

Correct Answer

verifed

verified

What is the estimated expected (mean) time for project completion?


A) 135 days
B) 145 days
C) 170 days
D) 180 days
E) 255 days

F) C) and D)
G) A) and B)

Correct Answer

verifed

verified

Given the network diagram below, determine the probability that the project will finish within 26 weeks of its start.Times on the diagram are in weeks.

Correct Answer

verifed

verified

What is the estimated expected (mean) time for project completion?


A) 100 days
B) 140 days
C) 199 days
D) 200 days
E) 440 days

F) A) and D)
G) A) and C)

Correct Answer

verifed

verified