A) product design
B) process design
C) personnel/organizational elements
D) manufacturing planning and control
E) kanban
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) work is needed at the work center
B) work is ready to be moved to the next station
C) a worker has run out of parts needed for further processing
D) a machine has broken down and needs immediate attention
E) a machine is ready for preventive maintenance
Correct Answer
verified
True/False
Correct Answer
verified
True/False
Correct Answer
verified
Short Answer
Correct Answer
verified
Multiple Choice
A) Inventories are an asset.
B) Lot sizes are optimized by formula.
C) Vendors are co-workers, essentially other departments of our organization.
D) Queues are a necessary investment.
E) all of the above
Correct Answer
verified
Multiple Choice
A) Where does waste occur?
B) Which processes or sub-processes exhibit the most variability?
C) Where are the best opportunities to extract more value from customers?
D) Where are process bottlenecks?
E) Where do errors occur?
Correct Answer
verified
True/False
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) maintaining equipment in good operating condition
B) replacing parts when they are worn but before they fail
C) workers maintaining their own equipment
D) eliminating supplies of spare parts to reduce capital investment
E) perceiving breakdowns as an opportunity for improvement
Correct Answer
verified
Multiple Choice
A) low to moderate levels of inventory
B) high quality, zero defects
C) minimal waste (less than 6%)
D) balanced and rapid flow
E) all of the above
Correct Answer
verified
Multiple Choice
A) Backup employees to cover for absenteeism
B) 100% inspection to remove defects
C) Dedicated equipment to reduce unit costs
D) Safety stocks to prevent stock-outs
E) Greater flexibility to cope with change
Correct Answer
verified
True/False
Correct Answer
verified
Short Answer
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) with products in the introduction phase of their life-cycle
B) with their vendors first
C) completely all at once
D) sequentially over time
E) globally before locally
Correct Answer
verified
Multiple Choice
A) command and control center
B) automation
C) andon
D) pull system
E) kanban
Correct Answer
verified
Multiple Choice
A) delayed differentiation
B) kanban
C) autonomation
D) andon
E) matrix management
Correct Answer
verified
True/False
Correct Answer
verified
Showing 41 - 60 of 88
Related Exams