Seven jobs must be scheduled.Each of the jobs must be processed on two machines (A and B) in the same order.The processing times are listed below.According to Johnson's rule,in what order should the jobs be processed? Seven jobs must be scheduled.Each of the jobs must be processed on two machines (A and B) in the same order.The processing times are listed below.According to Johnson's rule,in what order should the jobs be processed?   A) A-E-C-G-D-B-F B) A-C-E-G-D-B-F C) F-B-D-G-C-E-A D) F-D-B-G-E-C-A E) G-D-B-F-A-E-C


A) A-E-C-G-D-B-F
B) A-C-E-G-D-B-F
C) F-B-D-G-C-E-A
D) F-D-B-G-E-C-A
E) G-D-B-F-A-E-C

F) B) and D)
G) B) and E)

Correct Answer

verifed

verified

What are the three steps for the Johnson's Rule?

Correct Answer

verifed

verified

Step 1 - List jobs and processing time f...

View Answer

What does makespan measure?


A) WIP inventory
B) due-date performance
C) the amount of time it takes to finish a batch of jobs
D) job tardiness
E) job lateness

F) A) and C)
G) B) and D)

Correct Answer

verifed

verified

Using the Tibrewala,Phillippe,and Brown technique for a Monday through Sunday work week a regular,full time employee can end up with a Sunday-Monday set of days off.

A) True
B) False

Correct Answer

verifed

verified

Which of the following is a measure of how long after the due date the job is completed?


A) job belatedness
B) mean flow time
C) makespan
D) job overdueness
E) job tardiness

F) A) and E)
G) A) and C)

Correct Answer

verifed

verified

Jackie is the owner and the manager of an auto repair company.In order to be fair to all the customers,Jackie decides to use the FCFS priority rule in job sequencing.Currently,four cars need to be repaired.Assume that the cars arrive in the order listed,that is,A first,then B,then C,then D.The estimated labor times (in days)and promise dates are shown in the following table.Customers usually do not pick up their cars early.Today is day 0. Jackie is the owner and the manager of an auto repair company.In order to be fair to all the customers,Jackie decides to use the FCFS priority rule in job sequencing.Currently,four cars need to be repaired.Assume that the cars arrive in the order listed,that is,A first,then B,then C,then D.The estimated labor times (in days)and promise dates are shown in the following table.Customers usually do not pick up their cars early.Today is day 0.    Based on the FCFS sequence,calculate the following performance measures: (a)makespan,(b)average job flow time,(c)average number of jobs in the system,(d)average job tardiness. Based on the FCFS sequence,calculate the following performance measures: (a)makespan,(b)average job flow time,(c)average number of jobs in the system,(d)average job tardiness.

Correct Answer

verifed

verified

(a)19 days...

View Answer

The following jobs are waiting to be scheduled.Today is day 9.Determine the sequence of jobs by using EDD as a priority rule. The following jobs are waiting to be scheduled.Today is day 9.Determine the sequence of jobs by using EDD as a priority rule.   A) D-A-C-E-B B) B-E-C-A-D C) C-D-E-A-B D) B-A-E-D-C E) A-D-C-E-B


A) D-A-C-E-B
B) B-E-C-A-D
C) C-D-E-A-B
D) B-A-E-D-C
E) A-D-C-E-B

F) A) and B)
G) A) and C)

Correct Answer

verifed

verified

A local priority rule sets priority based only on the jobs waiting at that individual work center.

A) True
B) False

Correct Answer

verifed

verified

Which of the following statements is not true?


A) An hour lost at a bottleneck is an hour lost forever.
B) An hour lost at a non-bottleneck is just a mirage.
C) Bottlenecks determine throughput and system inventory.
D) The transfer batch does not have to equal the process batch.
E) Lead times are predetermined.

F) C) and D)
G) A) and E)

Correct Answer

verifed

verified

Which of the following is not an assumption of priority rules?


A) There is no variability in the setup time.
B) There is no variability in the run time of the job.
C) Multiple jobs are waiting to be processed.
D) Only a single job is waiting to be processed.
E) None of these answer choices are correct.

F) A) and D)
G) B) and D)

Correct Answer

verifed

verified

Flow operations are often related to high volume production.

A) True
B) False

Correct Answer

verifed

verified

Discuss how companies can benefit from both infinite and finite loading.

Correct Answer

verifed

verified

Infinite loading identifies the company'...

View Answer

Only Roses Flower Shop currently operates 7 days per week.The staffing needs for each day are shown in the following table.Each of the employees must have two consecutive days off in a week.(Since Monday is used as the first day of the pay week,an employee cannot be off on both Sunday and Monday.) What is the minimum number of employees that needs to be hired? Only Roses Flower Shop currently operates 7 days per week.The staffing needs for each day are shown in the following table.Each of the employees must have two consecutive days off in a week.(Since Monday is used as the first day of the pay week,an employee cannot be off on both Sunday and Monday.) What is the minimum number of employees that needs to be hired?   A) 5 B) 6 C) 7 D) 8 E) 9


A) 5
B) 6
C) 7
D) 8
E) 9

F) B) and C)
G) C) and D)

Correct Answer

verifed

verified

The following jobs must be processed in the Super Clean motor shop.Assume that the company operates seven days per week.Using FCFS as the priority rule,calculate average job tardiness. The following jobs must be processed in the Super Clean motor shop.Assume that the company operates seven days per week.Using FCFS as the priority rule,calculate average job tardiness.     A) 0 B) 6 C) .5 D) -2.833 E) -8


A) 0
B) 6
C) .5
D) -2.833
E) -8

F) A) and B)
G) B) and D)

Correct Answer

verifed

verified

Green Inc.manufactures a variety of wooden desks.Five jobs are waiting to be processed using the LPT priority rule.Their processing times are shown in the following table.What is the makespan? Green Inc.manufactures a variety of wooden desks.Five jobs are waiting to be processed using the LPT priority rule.Their processing times are shown in the following table.What is the makespan?   A) 66 B) 13.2 C) 27 D) 5.4 E) 2.4


A) 66
B) 13.2
C) 27
D) 5.4
E) 2.4

F) A) and B)
G) C) and E)

Correct Answer

verifed

verified

A progress chart shows the relationship between:


A) a Gantt chart and PERT chart
B) vacation schedule and work schedule
C) forecast and historical performance
D) planned and actual performance
E) planned and actual efficiency

F) B) and C)
G) C) and D)

Correct Answer

verifed

verified

Which of the following scheduling techniques determines the earliest possible completion time for a job?


A) finite loading
B) infinite loading
C) forward scheduling
D) backward scheduling
E) input/output control

F) None of the above
G) C) and E)

Correct Answer

verifed

verified

Which of the following sequencing rules is used for minimizing makespan in a two-stage,unidirectional process?


A) FCFS
B) S/RO
C) SPT
D) CR
E) Johnson's rule

F) All of the above
G) A) and B)

Correct Answer

verifed

verified

Operational schedules that consider work center capacity use ________________.

Correct Answer

verifed

verified

Six jobs are to be processed through a two-stage operation.The first operation involves drill pressing,and the second involves lathing.Process times are as follows Six jobs are to be processed through a two-stage operation.The first operation involves drill pressing,and the second involves lathing.Process times are as follows    Determine a sequence that will minimize the total completion time for these jobs. Determine a sequence that will minimize the total completion time for these jobs.